Preparation of detail project report (DPR) for construction of black topped road (1.7 km)
@Nuwakot district NEA Grid Solar and Efficiency Project, Durbar Marga, Kathmandu

Hydrological study and detail design, drawing and cost estimate of protection work of Nunamati khola Jhapa
@Water Resources and Irrigation, Development Division, Jhapa, Nepal

Identification of Sisdol Landfill Site affected areas and land utilization plan of surrounding area
@ Environment Management Department, Kathmandu Metropolitan City, Nepal 

Construction Material Survey of Rolwaling Hydroelectric Project (HEP), Dolakha
@ NEA Engineering Company Limited, Trade Tower Thapathali Kathmandu

Detailed Design of GAURIYA KRISHI SUDHAR Irrigation Project, Jhapa
@Water Resources and Irrigation, Development Division, Jhapa, Nepal

Design of Integrated Solid Waste Management system (Healthcare Waste + Municipal General Waste) in Nilkantha Municipality, Dhangadhi and Nepalgunj SMPC
@GIZ-S2HSP

Waste Management and Medical Equipment in health facilities in rural Nepal
@Consortium of MEH Consultants (P) Ltd and management4health, Germany (KFW consultants)

Geotechnical Expert services for Emergency School Reconstruction Projects (ESRP)​
@ Oriental Consultants Global (OCG), Japan (JICA Loan NE- P11)

Study on Solid Waste Management in Bidur Municipality
@ Capacity Development of New Municipalities, GIZ
Feasibility Study and Detail Engineering Design of Model Waste Processing (Management) Center with Material Recovery Facility (MRF) at 7 Different Places of 7 States
@ Solid Waste Management Technical Support Center (SWMTSC), Government of Nepal
 
 

SWM strategic and Action plan of 15 municipalities
@ Solid Waste Management Technical Support Center (SWMTSC), Government of Nepal

Consulting service on IEE of different quarry site in Kaski
@DDC Kaski

SWM baseline Study of 60 new municipalities ​
@Solid Waste Management Technical Support Center (SWMTSC), Government of Nepal​

Consulting service for of Geotechnical Guidelines for Bridge foundations
@ITECO Engineering, Switzerland (Consulting service for LRBP, DoLIDAR)

Consulting service for SWM strategic and action plan of Bhaktapur, Amargadhi, Kohalpur and Kirtipur municipalities
@Solid Waste Management Technical Support Center (SWMTSC), Government of Nepal

Consulting service on Detail Engineering Survey, Design and Cost Estimation of Luham-Kavra-Rampur Road, Salyan (Ch: 12.000 – 24.500)
@District Technical Office (DTO), Salyan

 Baseline Study on Current Status of Solid Waste Management in Tribhuvan International Airport
@Civil Engineering Division, Tribhuvan International Airport Civil Aviation Office

 
Consulting service for SWM strategic and action plan of Banepa, Panauti and Thimi municipality
@Solid Waste Management Technical Support Center (SWMTSC), Government of Nepal

 

Consulting service for SWM strategic and action plan of Lalitpur and Pokhara Sub-metropolitan City and Byas municipality
@Solid Waste Management Technical Support Center (SWMTSC)

 

Consulting services for preparation of digital map and database of proposed Banchare Danda long-term landfill site
@Solid Waste Management Technical Support Center (SWMTSC), Government of Nepal

Consulting services for scoping and Initial Environmental Examination (IEE) of proposed Khotena Bhurakhani landfill site of Tikapur municipality
@Solid Waste Management Technical Support Center (SWMTSC),Government of Nepal

 

Consulting services for preparation of
(i) operational manual short-term extended Sisdol landfill site
(ii) Report including design and cost estimate of fence work around acquired land at proposed Banchare Danda landfill site
@Solid Waste Management Technical Support Center (SWMTSC),Government of Nepal